Case Studies

Whether it’s a £200,000 car park project for NHS Logistics or an £9million Big Plant development project at Fiddlers Ferry, we put 100% into every single job we undertake. Here is just a selection of case studies of the projects and developments we’re most proud of.

To filter testimonials by sector, simply select an area from the navigation opposite.


Cerestar Multiple Packages

Cerestar Multiple Packages
BIG PLANT
This project comprised the construction of a new moist feed building, extension to the office building together with various other ancillary refurbishments and a variety of other civil engineering works.
Read the full case study »


Chester Old Port

Chester Old Port
WATER AND INLAND MARINE
This important, interesting and challenging project consisted of a flood defence scheme and construction of a new pedestrian and cycleway.
Read the full case study »


Chester Railway Station

Chester Railway Station
RAIL
As part of the £10 million Chester Renaissance regeneration programme of Chester Railway Station and the surrounding areas.
Read the full case study »


Fiddlers Ferry

Fiddlers Ferry
BIG PLANT
Fiddlers Ferry is a coal-fired power station located in Warrington, Cheshire, overlooking the River Mersey.
Read the full case study »


Ightenhill Bridge

Ightenhill Bridge
BRIDGES
Harry Fairclough was proud to secure the contract to replace the cycle/bridleway across the River Calder north of Ightenhill, Burnley.
Read the full case study »


Irlam Waste Water Treatment Plant

Irlam Waste Water Treatment Plant
WATER AND INLAND MARINE
The work undertaken by Harry Fairclough comprised drainage to chambers and pump stations of sewage/water treatment works at the Treatment Plant in Irlam, Manchester.
Read the full case study »


Moorgate Bridge

Moorgate Bridge
BRIDGES
A project undertaken on behalf of Blackburn with Darwen Borough Council.
Read the full case study »


Mustard Lane Reconstruction

Mustard Lane Reconstruction
MINOR WORKS
When a new pedestrian crossing was needed between St Lewis Church and the local primary school in Mustard Lane in Croft, it was Harry Fairclough that was called upon to do the engineering.
Read the full case study »