Mustard Lane Reconstruction

Project specification

Sector / Minor Works
Customer / Warrington Borough Council
Value / £0.5m

Project background

When a new pedestrian crossing was needed between St Lewis Church and the local primary school in Mustard Lane in Croft, it was Harry Fairclough that was called upon to do the engineering. As always, we completed the work with the minimum disruption to all involved.

Testimonial

“I write to offer my sincere thanks for the marvellous improvements to the highways outside the school. I was very impressed with the professionalism of your team, who liaised with the school at every opportunity – the manner certainly helped to ease the pain of the disruption.”
St Lewis Primary School

Return to case studies list